B04 Clashing Risers.zip (16.7 MB) – Description PDF (347 KB) Two drill strings are hung from a MODU. Pairs of strings are used if one string has to be disconnected and drilling is required to continue. In this model one string is connected to the wellhead while the other has been released and is being raised to the drilling vessel. This simulation looks at a snap-shot of the raising operation, assuming that the total free riser length remains constant, and applies a regular design wave. The risers are close enough together that hydrodynamic effects due to the wake shed by the free riser lead to clashing between the two drill strings. The clashing is analysed, and the effect of the wake behind the free riser is included in the model. |